Carris Storage I

Carris Storage I is a 10 MW battery storage project in Riverside County, California, operated by Hecate Grid Carris Storage 1 LLC. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
10 MW
10 MW net summer
Generating units
1
In service
2025
EIA plant ID
65733

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.8079, -116.494
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Hecate Grid Carris Storage 1 LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant Hecate Grid Carris Storage 1 LLC reports to EIA →

Carris Storage I: FAQ

Where is Carris Storage I?
In Riverside County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Carris Storage I?
10 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Carris Storage I?
EIA-860M names Hecate Grid Carris Storage 1 LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Carris Storage I LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Hecate Grid Carris Storage 1 LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Carris Storage I LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Carris Storage I still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.