Desert Peak Energy Storage II

Desert Peak Energy Storage II is a 75 MW battery storage project in Riverside County, California, operated by Desert Peak Energy Storage II, LLC. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
75 MW
75 MW net summer
Generating units
1
In service
2023
EIA plant ID
65988

Where it is

Loading map…
County
Riverside County, California
Coordinates
33.9311, -116.5719
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Desert Peak Energy Storage II, LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant Desert Peak Energy Storage II, LLC reports to EIA →

Desert Peak Energy Storage II: FAQ

Where is Desert Peak Energy Storage II?
In Riverside County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Desert Peak Energy Storage II?
75 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Desert Peak Energy Storage II?
EIA-860M names Desert Peak Energy Storage II, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Desert Peak Energy Storage II LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Desert Peak Energy Storage II, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Desert Peak Energy Storage II LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Desert Peak Energy Storage II still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.