BCE Los Alamitos 2

BCE Los Alamitos 2 is a 20 MW battery storage project in Orange County, California, operated by Bright Canyon Energy. It has 2 generating units here, inside CAISO. Its units entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
20 MW
20 MW net summer
Generating units
2
In service
2023
Plant code
66532

Where it is

Loading map…
County
Orange County, California
Coordinates
33.7841, -118.0509
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Bright Canyon Energy
Primary energy source
Battery
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Battery 10 MW, Solar 10 MW. It is listed here under Battery, the energy source with the most capacity.

BCE Los Alamitos 2: FAQ

Where is BCE Los Alamitos 2?
In Orange County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is BCE Los Alamitos 2?
20 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns BCE Los Alamitos 2?
Bright Canyon Energy is the operator of record. That is not always the ultimate owner.
Is this the same as BCE Los Alamitos 2 LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Bright Canyon Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "BCE Los Alamitos 2 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is BCE Los Alamitos 2 still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.