Calistoga Resilency Center

Calistoga Resilency Center is a 19 MW battery storage project in Napa County, California, operated by Calistoga Resiliency Center, LLC. EIA-860M lists 2 generating units here, inside CAISO. Its units entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
19.3 MW
19.3 MW net summer
Generating units
2
In service
2025
EIA plant ID
69358

Where it is

Loading map…
County
Napa County, California
Coordinates
38.577, -122.57
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Calistoga Resiliency Center, LLC
Primary energy source
Battery
Technologies
All Other, Batteries
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Battery 11 MW, Other 8 MW. It is filed here under Battery, the source with the most capacity.

Every plant Calistoga Resiliency Center, LLC reports to EIA →

Calistoga Resilency Center: FAQ

Where is Calistoga Resilency Center?
In Napa County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Calistoga Resilency Center?
19 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Calistoga Resilency Center?
EIA-860M names Calistoga Resiliency Center, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Calistoga Resilency Center LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Calistoga Resiliency Center, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Calistoga Resilency Center LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Calistoga Resilency Center still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.