Imeson Solar

Imeson Solar is a 10 MW battery storage project in Duval County, Florida, operated by Imeson Solar Farm LLC. EIA-860M lists 2 generating units here. Its units entered service in 2019.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
10 MW
10 MW net summer
Generating units
2
In service
2019
EIA plant ID
63186

Where it is

Loading map…
County
Duval County, Florida
Coordinates
30.4568, -81.7149
Balancing authority
JEA
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Imeson Solar Farm LLC
Primary energy source
Battery
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Battery 5 MW, Solar 5 MW. It is filed here under Battery, the source with the most capacity.

Every plant Imeson Solar Farm LLC reports to EIA →

Imeson Solar: FAQ

Where is Imeson Solar?
In Duval County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Imeson Solar?
10 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Imeson Solar?
EIA-860M names Imeson Solar Farm LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Imeson Solar LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Imeson Solar Farm LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Imeson Solar LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Imeson Solar still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.