71 Charlotte Furnace Rd Hybrid(CSG)

71 Charlotte Furnace Rd Hybrid(CSG) is a 2 MW battery storage project in Plymouth County, Massachusetts, operated by 71CFR WHAM8 Solar, LLC. It has 2 generating units here, inside ISO New England. Its units entered service in 2021.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
2 MW
2 MW net summer
Generating units
2
In service
2021
Plant code
65054

Where it is

Loading map…
County
Plymouth County, Massachusetts
Coordinates
41.7971, -70.7416
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
71CFR WHAM8 Solar, LLC
Primary energy source
Battery
Technologies
Batteries, Solar Photovoltaic
Status
Operating

This site runs on more than one energy source. Capacity splits: Battery 1 MW, Solar 1 MW. It is listed here under Battery, the energy source with the most capacity.

71 Charlotte Furnace Rd Hybrid(CSG): FAQ

Where is 71 Charlotte Furnace Rd Hybrid(CSG)?
In Plymouth County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is 71 Charlotte Furnace Rd Hybrid(CSG)?
2 MW of nameplate capacity across 2 units, as of 2026-07.
Who owns 71 Charlotte Furnace Rd Hybrid(CSG)?
71CFR WHAM8 Solar, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as 71 Charlotte Furnace Rd Hybrid(CSG) LLC?
Probably, but the plant data does not say. It records a plant name and an operator — 71CFR WHAM8 Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "71 Charlotte Furnace Rd Hybrid(CSG) LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is 71 Charlotte Furnace Rd Hybrid(CSG) still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.