Old Frontier Solar III
Old Frontier Solar III is a 4 MW battery storage project in Franklin County, Massachusetts, operated by Old Frontier Solar III PV, LLC. It has 2 generating units here, inside ISO New England. Its units entered service in 2022.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 4 MW
- 4 MW net summer
- Generating units
- 2
- In service
- 2022
- Plant code
- 68069
Where it is
Loading map…
- County
- Franklin County, Massachusetts
- Coordinates
- 42.494, -72.6225
- Balancing authority
- ISNE
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Old Frontier Solar III PV, LLC
- Primary energy source
- Battery
- Technologies
- Batteries, Solar Photovoltaic
- Status
- Operating
This site runs on more than one energy source. Capacity splits: Battery 2 MW, Solar 2 MW. It is listed here under Battery, the energy source with the most capacity.
Old Frontier Solar III: FAQ
- Where is Old Frontier Solar III?
- In Franklin County, Massachusetts (MA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Old Frontier Solar III?
- 4 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Old Frontier Solar III?
- Old Frontier Solar III PV, LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Old Frontier Solar III LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Old Frontier Solar III PV, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Old Frontier Solar III LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Old Frontier Solar III still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.