Silver Peak
Silver Peak is a 279 MW battery storage project in Clark County, Nevada, operated by Silver Peak Solar, LLC. It has 3 generating units here, inside CAISO. Its units entered service in 2025.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 279 MW
- 279 MW net summer
- Generating units
- 3
- In service
- 2025
- Plant code
- 67736
Where it is
Loading map…
- County
- Clark County, Nevada
- Coordinates
- 35.8311, -114.9924
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Silver Peak Solar, LLC
- Primary energy source
- Battery
- Technologies
- Batteries
- Status
- Operating
Silver Peak: FAQ
- Where is Silver Peak?
- In Clark County, Nevada (NV). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Silver Peak?
- 279 MW of nameplate capacity across 3 units, as of 2026-07.
- Who owns Silver Peak?
- Silver Peak Solar, LLC is the operator of record. That is not always the ultimate owner.
- Is this the same as Silver Peak LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Silver Peak Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Silver Peak LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Silver Peak still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.