Silver Peak
Silver Peak is a 279 MW battery storage project in Clark County, Nevada, operated by Silver Peak Solar, LLC. EIA-860M lists 3 generating units here, inside CAISO. Its units entered service in 2025.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 279 MW
- 279 MW net summer
- Generating units
- 3
- In service
- 2025
- EIA plant ID
- 67736
Where it is
Loading map…
- County
- Clark County, Nevada
- Coordinates
- 35.8311, -114.9924
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Silver Peak Solar, LLC
- Primary energy source
- Battery
- Technologies
- Batteries
- Status
- Operating
Silver Peak: FAQ
- Where is Silver Peak?
- In Clark County, Nevada (NV). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Silver Peak?
- 279 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
- Who owns Silver Peak?
- EIA-860M names Silver Peak Solar, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Silver Peak LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Silver Peak Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Silver Peak LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Silver Peak still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.