Silver Peak

Silver Peak is a 279 MW battery storage project in Clark County, Nevada, operated by Silver Peak Solar, LLC. It has 3 generating units here, inside CAISO. Its units entered service in 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
279 MW
279 MW net summer
Generating units
3
In service
2025
Plant code
67736

Where it is

Loading map…
County
Clark County, Nevada
Coordinates
35.8311, -114.9924
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Silver Peak Solar, LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Silver Peak: FAQ

Where is Silver Peak?
In Clark County, Nevada (NV). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Silver Peak?
279 MW of nameplate capacity across 3 units, as of 2026-07.
Who owns Silver Peak?
Silver Peak Solar, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Silver Peak LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Silver Peak Solar, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Silver Peak LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Silver Peak still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.