Battery Storage Projects in Nevada

Every operating battery storage project in Nevada as of 2026-07: 4 plants, 6 storage units and 709 MW of nameplate capacity across 2 counties.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
4
6 generating units
Nameplate capacity
709 MW
Counties
2
Grid operator
Mixed
no single ISO covers a majority

Map of battery storage projects in Nevada

Every one of the 4 plants is drawn at its reported coordinates.

Loading map…
  • Battery · 4

List of battery storage projects in Nevada

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

battery storage projects in Nevada
Silver PeakBatteriesSilver Peak Solar, LLCClark27932025Operating
Reid GardnerBatteriesNevada Power CoClark22012023Operating
Silver State South StorageBatteriesSilver State South Storage, LLCClark20012025Operating
Chukar Battery Energy Storage SystemBatteriesNevada Power CoStorey1012021Operating

Largest battery storage projects in Nevada

  1. 1Silver PeakClark County, Nevada279 MW
  2. 2Reid GardnerClark County, Nevada220 MW
  3. 3Silver State South StorageClark County, Nevada200 MW
  4. 4Chukar Battery Energy Storage SystemStorey County, Nevada10 MW

Battery storage projects by county in Nevada

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Clark3699
Storey110

Battery Storage Projects in Nevada: FAQ

How many battery storage projects are in Nevada?
4, with 709 MW of nameplate capacity between them, spread over 2 counties. That is the operating count as of 2026-07.
Is there a map of Nevada battery storage projects?
Yes — the map above. Each dot is one battery storage project, sized by nameplate capacity and placed at its reported site.
Which is the largest battery storage project in Nevada?
Silver Peak, at 279 MW. The table is sorted largest first, so the rest follow it.
Is there a battery storage project near me in Nevada?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Nevada's battery storage projects?
No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in Nevada is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Grid-connected battery (electrochemical) storage of 1 MW and above. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.