Ignacio Grid Energy Storage System

Ignacio Grid Energy Storage System is a 100 MW battery storage project in Hidalgo County, Texas, operated by Ignacio Grid, LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2023.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
100 MW
100 MW net summer
Generating units
1
In service
2023
Plant code
64089

Where it is

Loading map…
County
Hidalgo County, Texas
Coordinates
26.1669, -98.325
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Ignacio Grid, LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Ignacio Grid Energy Storage System: FAQ

Where is Ignacio Grid Energy Storage System?
In Hidalgo County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Ignacio Grid Energy Storage System?
100 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Ignacio Grid Energy Storage System?
Ignacio Grid, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Ignacio Grid Energy Storage System LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Ignacio Grid, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Ignacio Grid Energy Storage System LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Ignacio Grid Energy Storage System still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.