TX2 Port Lavaca

TX2 Port Lavaca is a 10 MW battery storage project in Calhoun County, Texas, operated by Key Capture Energy. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
9.9 MW
9.9 MW net summer
Generating units
1
In service
2020
EIA plant ID
64425

Where it is

Loading map…
County
Calhoun County, Texas
Coordinates
28.5867, -96.6838
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Key Capture Energy
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant Key Capture Energy reports to EIA →

TX2 Port Lavaca: FAQ

Where is TX2 Port Lavaca?
In Calhoun County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is TX2 Port Lavaca?
10 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns TX2 Port Lavaca?
EIA-860M names Key Capture Energy as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as TX2 Port Lavaca LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Key Capture Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "TX2 Port Lavaca LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is TX2 Port Lavaca still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.