Roseland Solar Project, LLC

Roseland Solar Project, LLC is a 52 MW battery storage project in Falls County, Texas, operated by Enel Green Power Roseland Solar, LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
51.8 MW
51.8 MW net summer
Generating units
1
In service
2023
EIA plant ID
65028

Where it is

Loading map…
County
Falls County, Texas
Coordinates
31.4612, -96.8249
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Enel Green Power Roseland Solar, LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant Enel Green Power Roseland Solar, LLC reports to EIA →

Roseland Solar Project, LLC: FAQ

Where is Roseland Solar Project, LLC?
In Falls County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Roseland Solar Project, LLC?
52 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Roseland Solar Project, LLC?
EIA-860M names Enel Green Power Roseland Solar, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is Roseland Solar Project, LLC still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.