TX15 Limousin Oak Storage

TX15 Limousin Oak Storage is a 100 MW battery storage project in Grimes County, Texas, operated by Key Capture Energy. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2024.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
100 MW
100 MW net summer
Generating units
1
In service
2024
Plant code
65698

Where it is

Loading map…
County
Grimes County, Texas
Coordinates
30.6599, -95.9738
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Key Capture Energy
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant operated by Key Capture Energy →

TX15 Limousin Oak Storage: FAQ

Where is TX15 Limousin Oak Storage?
In Grimes County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is TX15 Limousin Oak Storage?
100 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns TX15 Limousin Oak Storage?
Key Capture Energy is the operator of record. That is not always the ultimate owner.
Is this the same as TX15 Limousin Oak Storage LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Key Capture Energy here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "TX15 Limousin Oak Storage LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is TX15 Limousin Oak Storage still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.