Faulkner

Faulkner is a 10 MW battery storage project in Reeves County, Texas, operated by HEN Infrastructure, L.L.C.. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2022.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
9.9 MW
9.9 MW net summer
Generating units
1
In service
2022
EIA plant ID
65813

Where it is

Loading map…
County
Reeves County, Texas
Coordinates
31.2624, -103.7949
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
HEN Infrastructure, L.L.C.
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant HEN Infrastructure, L.L.C. reports to EIA →

Faulkner: FAQ

Where is Faulkner?
In Reeves County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Faulkner?
10 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Faulkner?
EIA-860M names HEN Infrastructure, L.L.C. as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Faulkner LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — HEN Infrastructure, L.L.C. here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Faulkner LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Faulkner still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.