Junction BESS

Junction BESS is a 10 MW battery storage project in Kimble County, Texas, operated by SBESS TX5 LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2025.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
9.9 MW
9.9 MW net summer
Generating units
1
In service
2025
EIA plant ID
67845

Where it is

Loading map…
County
Kimble County, Texas
Coordinates
30.5165, -99.7676
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
SBESS TX5 LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant SBESS TX5 LLC reports to EIA →

Junction BESS: FAQ

Where is Junction BESS?
In Kimble County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Junction BESS?
10 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Junction BESS?
EIA-860M names SBESS TX5 LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Junction BESS LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — SBESS TX5 LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Junction BESS LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Junction BESS still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.