Roadrunner Crossing Energy Storage

Roadrunner Crossing Energy Storage is a 150 MW battery storage project in Eastland County, Texas, operated by Roadrunner Crossing Energy Storage LLC. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
150 MW
150 MW net summer
Generating units
1
In service
2025
Plant code
68460

Where it is

Loading map…
County
Eastland County, Texas
Coordinates
32.4142, -99.1077
Balancing authority
ERCO
Sector
Industrial Non-CHP

Units, technology and status

Operator of record
Roadrunner Crossing Energy Storage LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Roadrunner Crossing Energy Storage: FAQ

Where is Roadrunner Crossing Energy Storage?
In Eastland County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Roadrunner Crossing Energy Storage?
150 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Roadrunner Crossing Energy Storage?
Roadrunner Crossing Energy Storage LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Roadrunner Crossing Energy Storage LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Roadrunner Crossing Energy Storage LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Roadrunner Crossing Energy Storage LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Roadrunner Crossing Energy Storage still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.