Tierra Seca

Tierra Seca is a 100 MW battery storage project in Val Verde County, Texas, operated by Tierra Seca BESS, LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2026.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
100 MW
100 MW net summer
Generating units
1
In service
2026
EIA plant ID
68748

Where it is

Loading map…
County
Val Verde County, Texas
Coordinates
29.3491, -100.8734
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Tierra Seca BESS, LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant Tierra Seca BESS, LLC reports to EIA →

Tierra Seca: FAQ

Where is Tierra Seca?
In Val Verde County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Tierra Seca?
100 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Tierra Seca?
EIA-860M names Tierra Seca BESS, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Tierra Seca LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Tierra Seca BESS, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Tierra Seca LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Tierra Seca still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.