Sweetwater BESS

Sweetwater BESS is a 10 MW battery storage project in Nolan County, Texas, operated by Sweetwater ESS Assets, LLC. EIA-860M lists 1 generating unit here, inside ERCOT. Its unit entered service in 2021.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
10 MW
10 MW net summer
Generating units
1
In service
2021
EIA plant ID
69413

Where it is

Loading map…
County
Nolan County, Texas
Coordinates
32.4575, -100.4437
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Sweetwater ESS Assets, LLC
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant Sweetwater ESS Assets, LLC reports to EIA →

Sweetwater BESS: FAQ

Where is Sweetwater BESS?
In Nolan County, Texas (TX). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Sweetwater BESS?
10 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Sweetwater BESS?
EIA-860M names Sweetwater ESS Assets, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Sweetwater BESS LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Sweetwater ESS Assets, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Sweetwater BESS LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Sweetwater BESS still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.