BESS TX Top Gear - BSHOU002
BESS TX Top Gear - BSHOU002 is a 10 MW battery storage project in Harris County, Texas, operated by Prologis Logistics Services Incorporated BESS. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2025.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 10 MW
- 10 MW net summer
- Generating units
- 1
- In service
- 2025
- Plant code
- 69574
Where it is
Loading map…
- County
- Harris County, Texas
- Coordinates
- 29.9631, -95.4369
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
Units, technology and status
- Operator of record
- Prologis Logistics Services Incorporated BESS
- Primary energy source
- Battery
- Technologies
- Batteries
- Status
- Operating
Every plant operated by Prologis Logistics Services Incorporated BESS →
BESS TX Top Gear - BSHOU002: FAQ
- Where is BESS TX Top Gear - BSHOU002?
- In Harris County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is BESS TX Top Gear - BSHOU002?
- 10 MW of nameplate capacity across 1 unit, as of 2026-07.
- Who owns BESS TX Top Gear - BSHOU002?
- Prologis Logistics Services Incorporated BESS is the operator of record. That is not always the ultimate owner.
- Is this the same as BESS TX Top Gear - BSHOU002 LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — Prologis Logistics Services Incorporated BESS here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "BESS TX Top Gear - BSHOU002 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is BESS TX Top Gear - BSHOU002 still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.