Non-PLD US-El Paso - BSSAT004

Non-PLD US-El Paso - BSSAT004 is a 10 MW battery storage project in Ector County, Texas, operated by Prologis Logistics Services Incorporated BESS. It has 1 generating unit here, inside ERCOT. Its unit entered service in 2025.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
9.9 MW
9.9 MW net summer
Generating units
1
In service
2025
Plant code
69576

Where it is

Loading map…
County
Ector County, Texas
Coordinates
31.8404, -102.7264
Balancing authority
ERCO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Prologis Logistics Services Incorporated BESS
Primary energy source
Battery
Technologies
Batteries
Status
Operating

Every plant operated by Prologis Logistics Services Incorporated BESS →

Non-PLD US-El Paso - BSSAT004: FAQ

Where is Non-PLD US-El Paso - BSSAT004?
In Ector County, Texas (TX). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Non-PLD US-El Paso - BSSAT004?
10 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Non-PLD US-El Paso - BSSAT004?
Prologis Logistics Services Incorporated BESS is the operator of record. That is not always the ultimate owner.
Is this the same as Non-PLD US-El Paso - BSSAT004 LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Prologis Logistics Services Incorporated BESS here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Non-PLD US-El Paso - BSSAT004 LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Non-PLD US-El Paso - BSSAT004 still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.