Georgia-Pacific Palatka Operations

Georgia-Pacific Palatka Operations is a 80 MW biomass power plant in Putnam County, Florida, operated by Georgia-Pacific Consr Ops LLC-Palatka. EIA-860M lists 2 generating units here. Its units entered service between 1965 and 1993.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
79.8 MW
69.7 MW net summer
Generating units
2
In service
1965–1993
EIA plant ID
10611

Where it is

Loading map…
County
Putnam County, Florida
Coordinates
29.6807, -81.6809
Balancing authority
FPL
Sector
Industrial CHP

Units, technology and status

Operator of record
Georgia-Pacific Consr Ops LLC-Palatka
Primary energy source
Biomass
Technologies
Wood/Wood Waste Biomass
Status
Operating

Every plant Georgia-Pacific Consr Ops LLC-Palatka reports to EIA →

Georgia-Pacific Palatka Operations: FAQ

Where is Georgia-Pacific Palatka Operations?
In Putnam County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Georgia-Pacific Palatka Operations?
80 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Georgia-Pacific Palatka Operations?
EIA-860M names Georgia-Pacific Consr Ops LLC-Palatka as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Georgia-Pacific Palatka Operations LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Georgia-Pacific Consr Ops LLC-Palatka here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Georgia-Pacific Palatka Operations LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Georgia-Pacific Palatka Operations still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.