Central District Wastewater Treat Plant

Central District Wastewater Treat Plant is a 5 MW biomass power plant in Miami Dade County, Florida, operated by Miami Dade Water & Sewer Dept. EIA-860M lists 4 generating units here. Its units entered service between 2013 and 2015.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
4.8 MW
4.8 MW net summer
Generating units
4
In service
2013–2015
EIA plant ID
54623

Where it is

Loading map…
County
Miami Dade County, Florida
Coordinates
25.7486, -80.1528
Balancing authority
FPL
Sector
Commercial CHP

Units, technology and status

Operator of record
Miami Dade Water & Sewer Dept
Primary energy source
Biomass
Technologies
Other Waste Biomass
Status
Operating

Every plant Miami Dade Water & Sewer Dept reports to EIA →

Central District Wastewater Treat Plant: FAQ

Where is Central District Wastewater Treat Plant?
In Miami Dade County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Central District Wastewater Treat Plant?
5 MW of nameplate capacity across 4 units, as of the EIA-860M release for 2026-07.
Who owns Central District Wastewater Treat Plant?
EIA-860M names Miami Dade Water & Sewer Dept as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Central District Wastewater Treat Plant LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Miami Dade Water & Sewer Dept here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Central District Wastewater Treat Plant LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Central District Wastewater Treat Plant still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.