Perdido

Perdido is a 3 MW biomass power plant in Escambia County, Florida, operated by Florida Power & Light Co. EIA-860M lists 2 generating units here. Its units entered service in 2010.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
3.2 MW
3 MW net summer
Generating units
2
In service
2010
EIA plant ID
57502

Where it is

Loading map…
County
Escambia County, Florida
Coordinates
30.57, -87.39
Balancing authority
FPL
Sector
Electric Utility

Units, technology and status

Operator of record
Florida Power & Light Co
Primary energy source
Biomass
Technologies
Landfill Gas
Status
Operating

Every plant Florida Power & Light Co reports to EIA →

Perdido: FAQ

Where is Perdido?
In Escambia County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Perdido?
3 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Perdido?
EIA-860M names Florida Power & Light Co as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Perdido LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Florida Power & Light Co here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Perdido LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Perdido still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.