Seminole Energy

Seminole Energy is a 5 MW biomass power plant in Seminole County, Florida, operated by NextEra Renewable Fuels, LLC. It has 3 generating units here. Its units entered service in 2007.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
4.8 MW
4.8 MW net summer
Generating units
3
In service
2007
Plant code
61780

Where it is

Loading map…
County
Seminole County, Florida
Coordinates
28.7902, -81.089
Balancing authority
FPL
Sector
IPP Non-CHP

Units, technology and status

Operator of record
NextEra Renewable Fuels, LLC
Primary energy source
Biomass
Technologies
Landfill Gas
Status
Operating

Every plant operated by NextEra Renewable Fuels, LLC →

Seminole Energy: FAQ

Where is Seminole Energy?
In Seminole County, Florida (FL). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Seminole Energy?
5 MW of nameplate capacity across 3 units, as of 2026-07.
Who owns Seminole Energy?
NextEra Renewable Fuels, LLC is the operator of record. That is not always the ultimate owner.
Is this the same as Seminole Energy LLC?
Probably, but the plant data does not say. It records a plant name and an operator — NextEra Renewable Fuels, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Seminole Energy LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Seminole Energy still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.