Seminole Energy

Seminole Energy is a 5 MW biomass power plant in Seminole County, Florida, operated by NextEra Renewable Fuels, LLC. EIA-860M lists 3 generating units here. Its units entered service in 2007.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
4.8 MW
4.8 MW net summer
Generating units
3
In service
2007
EIA plant ID
61780

Where it is

Loading map…
County
Seminole County, Florida
Coordinates
28.7902, -81.089
Balancing authority
FPL
Sector
IPP Non-CHP

Units, technology and status

Operator of record
NextEra Renewable Fuels, LLC
Primary energy source
Biomass
Technologies
Landfill Gas
Status
Operating

Every plant NextEra Renewable Fuels, LLC reports to EIA →

Seminole Energy: FAQ

Where is Seminole Energy?
In Seminole County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Seminole Energy?
5 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
Who owns Seminole Energy?
EIA-860M names NextEra Renewable Fuels, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Seminole Energy LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — NextEra Renewable Fuels, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Seminole Energy LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Seminole Energy still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.