PWD Northeast WPCP Biogas Cogen Plant

PWD Northeast WPCP Biogas Cogen Plant is a 6 MW biomass power plant in Philadelphia County, Pennsylvania, operated by Philadelphia Water Department. EIA-860M lists 4 generating units here, inside PJM. Its units entered service in 2013.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
5.6 MW
5.6 MW net summer
Generating units
4
In service
2013
EIA plant ID
58326

Where it is

Loading map…
County
Philadelphia County, Pennsylvania
Coordinates
39.9886, -75.0833
Balancing authority
PJM
Sector
Commercial CHP

Units, technology and status

Operator of record
Philadelphia Water Department
Primary energy source
Biomass
Technologies
Other Waste Biomass
Status
Operating

Every plant Philadelphia Water Department reports to EIA →

PWD Northeast WPCP Biogas Cogen Plant: FAQ

Where is PWD Northeast WPCP Biogas Cogen Plant?
In Philadelphia County, Pennsylvania (PA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is PWD Northeast WPCP Biogas Cogen Plant?
6 MW of nameplate capacity across 4 units, as of the EIA-860M release for 2026-07.
Who owns PWD Northeast WPCP Biogas Cogen Plant?
EIA-860M names Philadelphia Water Department as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as PWD Northeast WPCP Biogas Cogen Plant LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Philadelphia Water Department here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "PWD Northeast WPCP Biogas Cogen Plant LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is PWD Northeast WPCP Biogas Cogen Plant still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.