Covanta Alexandria/Arlington Energy

Covanta Alexandria/Arlington Energy is a 29 MW biomass power plant in Alexandria City County, Virginia, operated by Covanta Alexandria/Arlington. EIA-860M lists 2 generating units here, inside PJM. Its units entered service in 1987.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
29 MW
29 MW net summer
Generating units
2
In service
1987
EIA plant ID
50663

Where it is

Loading map…
County
Alexandria City County, Virginia
Coordinates
38.8014, -77.1288
Balancing authority
PJM
Sector
Commercial Non-CHP

Units, technology and status

Operator of record
Covanta Alexandria/Arlington
Primary energy source
Biomass
Technologies
Municipal Solid Waste
Status
Operating

Every plant Covanta Alexandria/Arlington reports to EIA →

Covanta Alexandria/Arlington Energy: FAQ

Where is Covanta Alexandria/Arlington Energy?
In Alexandria City County, Virginia (VA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Covanta Alexandria/Arlington Energy?
29 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Covanta Alexandria/Arlington Energy?
EIA-860M names Covanta Alexandria/Arlington as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Covanta Alexandria/Arlington Energy LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Covanta Alexandria/Arlington here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Covanta Alexandria/Arlington Energy LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Covanta Alexandria/Arlington Energy still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.