Coal Power Plants in Alabama
Every operating coal power plant in Alabama on EIA-860M for 2026-07: 1 plants, 4 generating units and 3 GW of nameplate capacity across 1 county.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 1
- 4 generating units
- Nameplate capacity
- 3 GW
- Counties
- 1
- Grid operator
- Mixed
- no single ISO covers a majority
Map of coal power plants in Alabama
Every one of the 1 plants is drawn at the coordinate EIA files for it.
Loading map…
- Coal · 1
List of coal power plants in Alabama
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| James H Miller JrConventional Steam Coal | Alabama Power Co | Jefferson | 2,822 | 4 | 1978 | Operating |
Largest coal power plants in Alabama
- 1James H Miller JrJefferson County, Alabama2,822 MW
Coal power plants by county in Alabama
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Jefferson | 1 | 2,822 |
Coal Power Plants in Alabama: FAQ
- How many coal power plants are in Alabama?
- 1, with 3 GW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
- Is there a map of Alabama coal power plants?
- Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest coal power plant in Alabama?
- James H Miller Jr, at 3 GW. The table is sorted largest first, so the rest follow it.
- Is there a coal power plant near me in Alabama?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Alabama's coal power plants?
- No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Alabama is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- EIA-860M for 2026-07. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.