Coal Power Plants in Arizona

Every operating coal power plant in Arizona as of 2026-07: 2 plants, 9 generating units and 3 GW of nameplate capacity across 1 county.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
2
9 generating units
Nameplate capacity
3 GW
Counties
1
Grid operator
Mixed
no single ISO covers a majority

Map of coal power plants in Arizona

Every one of the 2 plants is drawn at its reported coordinates.

Loading map…
  • Coal · 2

List of coal power plants in Arizona

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

coal power plants in Arizona
Springerville2 technologiesTucson Electric Power CoApache1,779.271985Operating
CoronadoConventional Steam CoalSalt River ProjectApache821.821979Operating

Largest coal power plants in Arizona

  1. 1SpringervilleApache County, Arizona1,779.2 MW
  2. 2CoronadoApache County, Arizona821.8 MW

Coal power plants by county in Arizona

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Apache22,601

Coal Power Plants in Arizona: FAQ

How many coal power plants are in Arizona?
2, with 3 GW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
Is there a map of Arizona coal power plants?
Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at its reported site.
Which is the largest coal power plant in Arizona?
Springerville, at 2 GW. The table is sorted largest first, so the rest follow it.
Is there a coal power plant near me in Arizona?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Arizona's coal power plants?
No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in Arizona is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.