Coal Power Plants in California

Every operating coal power plant in California as of 2026-07: 1 plants, 3 generating units and 63 MW of nameplate capacity across 1 county, most of it inside CAISO.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
1
3 generating units
Nameplate capacity
63 MW
Counties
1
Grid operator
CAISO
covers most of these plants

Map of coal power plants in California

Every one of the 1 plants is drawn at its reported coordinates.

Loading map…
  • Coal · 1

List of coal power plants in California

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

coal power plants in California
Argus Cogen PlantConventional Steam CoalSearles Valley Minerals Operations Inc.San Bernardino62.531947Operating

Largest coal power plants in California

  1. 1Argus Cogen PlantSan Bernardino County, California62.5 MW

Coal power plants by county in California

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
San Bernardino162.5

Coal Power Plants in California: FAQ

How many coal power plants are in California?
1, with 63 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
Is there a map of California coal power plants?
Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at its reported site.
Which is the largest coal power plant in California?
Argus Cogen Plant, at 63 MW. The table is sorted largest first, so the rest follow it.
Is there a coal power plant near me in California?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs California's coal power plants?
Most of them sit inside CAISO, going by the balancing authority each plant is assigned to. Live conditions for that market are on this site.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.