Coal Power Plants in Florida

Every operating coal power plant in Florida on EIA-860M for 2026-07: 2 plants, 11 generating units and 3 GW of nameplate capacity across 2 counties.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
2
11 generating units
Nameplate capacity
3 GW
Counties
2
Grid operator
Mixed
no single ISO covers a majority

Map of coal power plants in Florida

Every one of the 2 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Coal · 2

List of coal power plants in Florida

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

coal power plants in Florida
Northside Generating Station3 technologiesJEADuval1,407.171966Operating
Stanton Energy Center2 technologiesOrlando Utilities CommOrange1,26241987Operating

Largest coal power plants in Florida

  1. 1Northside Generating StationDuval County, Florida1,407.1 MW
  2. 2Stanton Energy CenterOrange County, Florida1,262 MW

Coal power plants by county in Florida

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Duval11,407.1
Orange11,262

Coal Power Plants in Florida: FAQ

How many coal power plants are in Florida?
2, with 3 GW of nameplate capacity between them, spread over 2 counties. That is the EIA-860M operating count for 2026-07.
Is there a map of Florida coal power plants?
Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest coal power plant in Florida?
Northside Generating Station, at 1 GW. The table is sorted largest first, so the rest follow it.
Is there a coal power plant near me in Florida?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Florida's coal power plants?
No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Florida is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
EIA-860M for 2026-07. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.