Coal Power Plants in Georgia

Every operating coal power plant in Georgia as of 2026-07: 2 plants, 7 generating units and 6 GW of nameplate capacity across 2 counties.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Plants
2
7 generating units
Nameplate capacity
6 GW
Counties
2
Grid operator
Mixed
no single ISO covers a majority

Map of coal power plants in Georgia

Every one of the 2 plants is drawn at its reported coordinates.

Loading map…
  • Coal · 2

List of coal power plants in Georgia

Sort by any column. Capacity is nameplate, summed across every generating unit at the site.

coal power plants in Georgia
BowenConventional Steam CoalGeorgia Power CoBartow3,498.641971Operating
SchererConventional Steam CoalGeorgia Power CoMonroe2,67331982Operating

Largest coal power plants in Georgia

  1. 1BowenBartow County, Georgia3,498.6 MW
  2. 2SchererMonroe County, Georgia2,673 MW

Coal power plants by county in Georgia

The county each plant sits in. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Bartow13,498.6
Monroe12,673

Coal Power Plants in Georgia: FAQ

How many coal power plants are in Georgia?
2, with 6 GW of nameplate capacity between them, spread over 2 counties. That is the operating count as of 2026-07.
Is there a map of Georgia coal power plants?
Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at its reported site.
Which is the largest coal power plant in Georgia?
Bowen, at 3 GW. The table is sorted largest first, so the rest follow it.
Is there a coal power plant near me in Georgia?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Georgia's coal power plants?
No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in Georgia is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
Data as of 2026-07, updated monthly. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.