Coal Power Plants in Georgia
Every operating coal power plant in Georgia on EIA-860M for 2026-07: 2 plants, 7 generating units and 6 GW of nameplate capacity across 2 counties.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 2
- 7 generating units
- Nameplate capacity
- 6 GW
- Counties
- 2
- Grid operator
- Mixed
- no single ISO covers a majority
Map of coal power plants in Georgia
Every one of the 2 plants is drawn at the coordinate EIA files for it.
Loading map…
- Coal · 2
List of coal power plants in Georgia
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
Largest coal power plants in Georgia
- 1BowenBartow County, Georgia3,498.6 MW
- 2SchererMonroe County, Georgia2,673 MW
Coal power plants by county in Georgia
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Bartow | 1 | 3,498.6 |
| Monroe | 1 | 2,673 |
Coal Power Plants in Georgia: FAQ
- How many coal power plants are in Georgia?
- 2, with 6 GW of nameplate capacity between them, spread over 2 counties. That is the EIA-860M operating count for 2026-07.
- Is there a map of Georgia coal power plants?
- Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest coal power plant in Georgia?
- Bowen, at 3 GW. The table is sorted largest first, so the rest follow it.
- Is there a coal power plant near me in Georgia?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Georgia's coal power plants?
- No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Georgia is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- EIA-860M for 2026-07. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.