Coal Power Plants in Maryland
Every operating coal power plant in Maryland on EIA-860M for 2026-07: 1 plants, 2 generating units and 1 GW of nameplate capacity across 1 county, most of it inside PJM.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Plants
- 1
- 2 generating units
- Nameplate capacity
- 1 GW
- Counties
- 1
- Grid operator
- PJM
- covers most of these plants
Map of coal power plants in Maryland
Every one of the 1 plants is drawn at the coordinate EIA files for it.
Loading map…
- Coal · 1
List of coal power plants in Maryland
Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.
| Brandon ShoresConventional Steam Coal | Brandon Shores LLC | Anne Arundel | 1,370.2 | 2 | 1984 | Operating |
Largest coal power plants in Maryland
- 1Brandon ShoresAnne Arundel County, Maryland1,370.2 MW
Coal power plants by county in Maryland
The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Anne Arundel | 1 | 1,370.2 |
Coal Power Plants in Maryland: FAQ
- How many coal power plants are in Maryland?
- 1, with 1 GW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
- Is there a map of Maryland coal power plants?
- Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
- Which is the largest coal power plant in Maryland?
- Brandon Shores, at 1 GW. The table is sorted largest first, so the rest follow it.
- Is there a coal power plant near me in Maryland?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Maryland's coal power plants?
- Most of them sit inside PJM, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
- How current is this, and what is left out?
- EIA-860M for 2026-07. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.