Coal Power Plants in Maryland

Every operating coal power plant in Maryland on EIA-860M for 2026-07: 1 plants, 2 generating units and 1 GW of nameplate capacity across 1 county, most of it inside PJM.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
1
2 generating units
Nameplate capacity
1 GW
Counties
1
Grid operator
PJM
covers most of these plants

Map of coal power plants in Maryland

Every one of the 1 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Coal · 1

List of coal power plants in Maryland

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

coal power plants in Maryland
Brandon ShoresConventional Steam CoalBrandon Shores LLCAnne Arundel1,370.221984Operating

Largest coal power plants in Maryland

  1. 1Brandon ShoresAnne Arundel County, Maryland1,370.2 MW

Coal power plants by county in Maryland

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Anne Arundel11,370.2

Coal Power Plants in Maryland: FAQ

How many coal power plants are in Maryland?
1, with 1 GW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
Is there a map of Maryland coal power plants?
Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest coal power plant in Maryland?
Brandon Shores, at 1 GW. The table is sorted largest first, so the rest follow it.
Is there a coal power plant near me in Maryland?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Maryland's coal power plants?
Most of them sit inside PJM, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
How current is this, and what is left out?
EIA-860M for 2026-07. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.