Coal Power Plants in Mississippi
Every operating coal power plant in Mississippi as of 2026-07: 1 plants, 1 generating units and 514 MW of nameplate capacity across 1 county.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Plants
- 1
- 1 generating units
- Nameplate capacity
- 514 MW
- Counties
- 1
- Grid operator
- Mixed
- no single ISO covers a majority
Map of coal power plants in Mississippi
Every one of the 1 plants is drawn at its reported coordinates.
Loading map…
- Coal · 1
List of coal power plants in Mississippi
Sort by any column. Capacity is nameplate, summed across every generating unit at the site.
| Red Hills Generating FacilityConventional Steam Coal | Choctaw Generation L.P, L.L.L.P. | Choctaw | 513.7 | 1 | 2001 | Operating |
|---|
Largest coal power plants in Mississippi
- 1Red Hills Generating FacilityChoctaw County, Mississippi513.7 MW
Coal power plants by county in Mississippi
The county each plant sits in. It is the fastest way to find the plant nearest a given town.
| County | Plants | Nameplate MW |
|---|---|---|
| Choctaw | 1 | 513.7 |
Coal Power Plants in Mississippi: FAQ
- How many coal power plants are in Mississippi?
- 1, with 514 MW of nameplate capacity between them, spread over 1 county. That is the operating count as of 2026-07.
- Is there a map of Mississippi coal power plants?
- Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at its reported site.
- Which is the largest coal power plant in Mississippi?
- Red Hills Generating Facility, at 514 MW. The table is sorted largest first, so the rest follow it.
- Is there a coal power plant near me in Mississippi?
- The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
- Which grid operator runs Mississippi's coal power plants?
- No single ISO or RTO covers most of them. Each plant belongs to its own balancing authority, which in Mississippi is largely a vertically integrated utility rather than an organised market.
- How current is this, and what is left out?
- Data as of 2026-07, updated monthly. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not included; retirements and additions after 2026-07 arrive with the next monthly update.