Every operating coal power plant in Mississippi on EIA-860M for 2026-07: 1 plants, 1 generating units and 514 MW of nameplate capacity across 1 county.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
1
1 generating units
Nameplate capacity
514 MW
Counties
1
Grid operator
Mixed
no single ISO covers a majority

Map of coal power plants in Mississippi

Every one of the 1 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Coal · 1

List of coal power plants in Mississippi

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

coal power plants in Mississippi
Red Hills Generating FacilityConventional Steam CoalChoctaw Generation L.P, L.L.L.P.Choctaw513.712001Operating

Largest coal power plants in Mississippi

  1. 1Red Hills Generating FacilityChoctaw County, Mississippi513.7 MW

Coal power plants by county in Mississippi

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
Choctaw1513.7

Coal Power Plants in Mississippi: FAQ

How many coal power plants are in Mississippi?
1, with 514 MW of nameplate capacity between them, spread over 1 county. That is the EIA-860M operating count for 2026-07.
Is there a map of Mississippi coal power plants?
Yes — the map above. Each dot is one coal power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest coal power plant in Mississippi?
Red Hills Generating Facility, at 514 MW. The table is sorted largest first, so the rest follow it.
Is there a coal power plant near me in Mississippi?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Mississippi's coal power plants?
No single ISO or RTO covers most of them. EIA files each plant against its own balancing authority, which in Mississippi is largely a vertically integrated utility rather than an organised market.
How current is this, and what is left out?
EIA-860M for 2026-07. Conventional steam coal and integrated gasification combined cycle. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.