Chili Bar

Chili Bar is a 8 MW hydroelectric power plant in El Dorado County, California, operated by Sacramento Municipal Util Dist. It has 1 generating unit here, inside CAISO. Its unit entered service in 1965.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
8.3 MW
7 MW net summer
Generating units
1
In service
1965
Plant code
225

Where it is

Loading map…
County
El Dorado County, California
Coordinates
38.7718, -120.8132
Balancing authority
CISO
Sector
Electric Utility

Units, technology and status

Operator of record
Sacramento Municipal Util Dist
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Operating

Every plant operated by Sacramento Municipal Util Dist →

Chili Bar: FAQ

Where is Chili Bar?
In El Dorado County, California (CA). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Chili Bar?
8 MW of nameplate capacity across 1 unit, as of 2026-07.
Who owns Chili Bar?
Sacramento Municipal Util Dist is the operator of record. That is not always the ultimate owner.
Is this the same as Chili Bar LLC?
Probably, but the plant data does not say. It records a plant name and an operator — Sacramento Municipal Util Dist here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Chili Bar LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Chili Bar still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.