Clear Lake Hydro Project

Clear Lake Hydro Project is a 3 MW hydroelectric power plant in Lake County, California, operated by Yolo County Flood Control WCD. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 1985.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
2.5 MW
2.4 MW net summer
Generating units
1
In service
1985
EIA plant ID
50128

Where it is

Loading map…
County
Lake County, California
Coordinates
38.9236, -122.5667
Balancing authority
CISO
Sector
Commercial Non-CHP

Units, technology and status

Operator of record
Yolo County Flood Control WCD
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Out of service and NOT expected to return to service in next calendar year

Every plant Yolo County Flood Control WCD reports to EIA →

Clear Lake Hydro Project: FAQ

Where is Clear Lake Hydro Project?
In Lake County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Clear Lake Hydro Project?
3 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Clear Lake Hydro Project?
EIA-860M names Yolo County Flood Control WCD as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Clear Lake Hydro Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Yolo County Flood Control WCD here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Clear Lake Hydro Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Clear Lake Hydro Project still running?
EIA-860M files it as "Out of service and NOT expected to return to service in next calendar year" for 2026-07. Statuses change monthly, and this page follows the monthly release.