Terminus Hydroelectric Project

Terminus Hydroelectric Project is a 20 MW hydroelectric power plant in Tulare County, California, operated by Eagle Creek Renewable Energy, LLC. EIA-860M lists 1 generating unit here, inside CAISO. Its unit entered service in 1990.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
20.1 MW
20 MW net summer
Generating units
1
In service
1990
EIA plant ID
54343

Where it is

Loading map…
County
Tulare County, California
Coordinates
36.4156, -119.0069
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
Eagle Creek Renewable Energy, LLC
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Operating

Every plant Eagle Creek Renewable Energy, LLC reports to EIA →

Terminus Hydroelectric Project: FAQ

Where is Terminus Hydroelectric Project?
In Tulare County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Terminus Hydroelectric Project?
20 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Terminus Hydroelectric Project?
EIA-860M names Eagle Creek Renewable Energy, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Terminus Hydroelectric Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Eagle Creek Renewable Energy, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Terminus Hydroelectric Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Terminus Hydroelectric Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.