Derby Hydro

Derby Hydro is a 9 MW hydroelectric power plant in Fairfield County, Connecticut, operated by McCallum Enterprises I LP. It has 4 generating units here, inside ISO New England. Its units entered service in 1989.

As of 2026-07 · updated 2026-07-31 · Source: EIA-860M

Nameplate capacity
8.6 MW
8.6 MW net summer
Generating units
4
In service
1989
Plant code
10063

Where it is

Loading map…
County
Fairfield County, Connecticut
Coordinates
41.3243, -73.1021
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
McCallum Enterprises I LP
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Operating (2) · Standby/Backup (2)

Derby Hydro: FAQ

Where is Derby Hydro?
In Fairfield County, Connecticut (CT). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
How big is Derby Hydro?
9 MW of nameplate capacity across 4 units, as of 2026-07.
Who owns Derby Hydro?
McCallum Enterprises I LP is the operator of record. That is not always the ultimate owner.
Is this the same as Derby Hydro LLC?
Probably, but the plant data does not say. It records a plant name and an operator — McCallum Enterprises I LP here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Derby Hydro LLC" usually means this site. This page does not assert a corporate structure it cannot see.
Is Derby Hydro still running?
Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.