Derby Hydro is a 9 MW hydroelectric power plant in Fairfield County, Connecticut, operated by McCallum Enterprises I LP. EIA-860M lists 4 generating units here, inside ISO New England. Its units entered service in 1989.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
8.6 MW
8.6 MW net summer
Generating units
4
In service
1989
EIA plant ID
10063

Where it is

Loading map…
County
Fairfield County, Connecticut
Coordinates
41.3243, -73.1021
Balancing authority
ISNE
Sector
IPP Non-CHP

Units, technology and status

Operator of record
McCallum Enterprises I LP
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Operating (2) · Standby/Backup (2)

Every plant McCallum Enterprises I LP reports to EIA →

Derby Hydro: FAQ

Where is Derby Hydro?
In Fairfield County, Connecticut (CT). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Derby Hydro?
9 MW of nameplate capacity across 4 units, as of the EIA-860M release for 2026-07.
Who owns Derby Hydro?
EIA-860M names McCallum Enterprises I LP as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Derby Hydro LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — McCallum Enterprises I LP here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Derby Hydro LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Derby Hydro still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.