Hydroelectric Power Plants in Connecticut

Every operating hydroelectric power plant in Connecticut on EIA-860M for 2026-07: 13 plants, 37 generating units and 116 MW of nameplate capacity across 6 counties, most of it inside ISO New England.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
13
37 generating units
Nameplate capacity
116 MW
Counties
6
Grid operator
ISO New England
covers most of these plants

Map of hydroelectric power plants in Connecticut

Every one of the 13 plants is drawn at the coordinate EIA files for it.

Loading map…
  • Hydro · 13

List of hydroelectric power plants in Connecticut

Sort by any column. Capacity is nameplate, summed across every generating unit EIA lists at the site.

hydroelectric power plants in Connecticut
ShepaugConventional HydroelectricFirstLight Power Resources Services LLCNew Haven37.211955Operating
StevensonConventional HydroelectricFirstLight Power Resources Services LLCFairfield30.541919Operating
Falls VillageConventional HydroelectricFirstLight Power Resources Services LLCLitchfield931914Operating
Derby HydroConventional HydroelectricMcCallum Enterprises I LPFairfield8.641989Operating
Rainbow (CT)Conventional HydroelectricFarmington River Power CompanyHartford821925Operating
Bulls BridgeConventional HydroelectricFirstLight Power Resources Services LLCLitchfield7.261903Operating
Goodwin HydroelectricConventional HydroelectricMetropolitan Dist of HartfordHartford3.221986Out of service but expected to return to service in next calendar year
Wyre Wynd Hydroelectric ProjectConventional HydroelectricRelevate Power Management LLCNew London2.821984Operating
Quinebaug Lower ProjectConventional HydroelectricQuinebaug Associates LLCWindham2.541990Operating
Kinneytown New OldConventional HydroelectricHydroland Omega LLCNew Haven2.321986Operating
Scotland DamConventional HydroelectricFirstLight Power Resources Services LLCWindham211937Operating
TaftvilleConventional HydroelectricFirstLight Power Resources Services LLCNew London1.651906Operating
Tenth StreetConventional HydroelectricCity of Norwich - (CT)New London1.411967Operating

Largest hydroelectric power plants in Connecticut

  1. 1ShepaugNew Haven County, Connecticut37.2 MW
  2. 2StevensonFairfield County, Connecticut30.5 MW
  3. 3Falls VillageLitchfield County, Connecticut9 MW
  4. 4Derby HydroFairfield County, Connecticut8.6 MW
  5. 5Rainbow (CT)Hartford County, Connecticut8 MW
  6. 6Bulls BridgeLitchfield County, Connecticut7.2 MW
  7. 7Goodwin HydroelectricHartford County, Connecticut3.2 MW
  8. 8Wyre Wynd Hydroelectric ProjectNew London County, Connecticut2.8 MW
  9. 9Quinebaug Lower ProjectWindham County, Connecticut2.5 MW
  10. 10Kinneytown New OldNew Haven County, Connecticut2.3 MW

Hydroelectric power plants by county in Connecticut

The county EIA files against each plant. It is the fastest way to find the plant nearest a given town.

CountyPlantsNameplate MW
New Haven239.5
Fairfield239.1
Litchfield216.2
Hartford211.2
New London35.8
Windham24.5

Hydroelectric Power Plants in Connecticut: FAQ

How many hydroelectric power plants are in Connecticut?
13, with 116 MW of nameplate capacity between them, spread over 6 counties. That is the EIA-860M operating count for 2026-07.
Is there a map of Connecticut hydroelectric power plants?
Yes — the map above. Each dot is one hydroelectric power plant, sized by nameplate capacity and placed at the coordinates EIA files for it.
Which is the largest hydroelectric power plant in Connecticut?
Shepaug, at 37 MW. The table is sorted largest first, so the rest follow it.
Is there a hydroelectric power plant near me in Connecticut?
The county roll-up below groups every plant by county, which is the quickest way to find the one closest to a given town.
Which grid operator runs Connecticut's hydroelectric power plants?
Most of them sit inside ISO New England, according to the balancing-authority code EIA files against each plant. Live conditions for that market are on this site.
How current is this, and what is left out?
EIA-860M for 2026-07. Conventional hydroelectric. Pumped storage is counted separately. Plants below 1 MW are not surveyed by EIA and so are absent; retirements and additions after 2026-07 arrive with the next monthly release.