Allatoona

Allatoona is a 87 MW hydroelectric power plant in Bartow County, Georgia, operated by USCE-Mobile District. EIA-860M lists 3 generating units here. Its units entered service in 1950.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
86.6 MW
72 MW net summer
Generating units
3
In service
1950
EIA plant ID
760

Where it is

Loading map…
County
Bartow County, Georgia
Coordinates
34.1637, -84.7282
Balancing authority
SOCO
Sector
Electric Utility

Units, technology and status

Operator of record
USCE-Mobile District
Primary energy source
Hydro
Technologies
Conventional Hydroelectric
Status
Operating

Every plant USCE-Mobile District reports to EIA →

Allatoona: FAQ

Where is Allatoona?
In Bartow County, Georgia (GA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Allatoona?
87 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
Who owns Allatoona?
EIA-860M names USCE-Mobile District as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Allatoona LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — USCE-Mobile District here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Allatoona LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Allatoona still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.