USCE-Mobile District power plants

Every generating plant EIA-860M files against USCE-Mobile District for 2026-07: 8 plants, 1 GW of nameplate capacity, across 3 states and 1 energy source.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Plants
8
Nameplate capacity
1 GW
States
3
AL, FL, GA
Energy sources
1

USCE-Mobile District plants by energy source

  • Hydro8 plants · 1,186 MW

Full list of USCE-Mobile District power plants

Power plants operated by USCE-Mobile District
Carters2 technologiesUSCE-Mobile DistrictMurray50041975Operating
Walter F GeorgeConventional HydroelectricUSCE-Mobile DistrictClay16841963Operating
BufordConventional HydroelectricUSCE-Mobile DistrictForsyth131.232003Operating
Millers FerryConventional HydroelectricUSCE-Mobile DistrictWilcox101.131970Operating
AllatoonaConventional HydroelectricUSCE-Mobile DistrictBartow86.631950Operating
Jones BluffConventional HydroelectricUSCE-Mobile DistrictAutauga8241975Operating
West Point (GA)Conventional HydroelectricUSCE-Mobile DistrictTroup73.331975Operating
J WoodruffConventional HydroelectricUSCE-Mobile DistrictGadsden43.532001Operating

USCE-Mobile District: FAQ

How many power plants does USCE-Mobile District operate?
EIA-860M lists 8 operating plants against “USCE-Mobile District” for 2026-07, totalling 1 GW of nameplate capacity in 3 states.
Is USCE-Mobile District the owner of these plants?
EIA-860M names one reporting entity per generator. That entity operates the plant on the survey; ownership can sit with a parent, a partnership or a tax-equity structure that the form does not record.
Why are affiliates listed separately?
Because EIA files them separately. Rolling subsidiaries into a parent would need an ownership map EIA-860M does not publish, so this page does not invent one.