Hydro III
Hydro III is a 1 MW hydroelectric power plant in Cache County, Utah, operated by City of Logan - (UT). It has 2 generating units here. Its units entered service in 1925.
As of 2026-07 · updated 2026-07-31 · Source: EIA-860M
- Nameplate capacity
- 1.4 MW
- 1.4 MW net summer
- Generating units
- 2
- In service
- 1925
- Plant code
- 3675
Where it is
Loading map…
- County
- Cache County, Utah
- Coordinates
- 41.7464, -111.746
- Balancing authority
- PACE
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- City of Logan - (UT)
- Primary energy source
- Hydro
- Technologies
- Conventional Hydroelectric
- Status
- Operating
Hydro III: FAQ
- Where is Hydro III?
- In Cache County, Utah (UT). The map on this page is placed at the plant's reported coordinates, which locate the site rather than any individual unit.
- How big is Hydro III?
- 1 MW of nameplate capacity across 2 units, as of 2026-07.
- Who owns Hydro III?
- City of Logan - (UT) is the operator of record. That is not always the ultimate owner.
- Is this the same as Hydro III LLC?
- Probably, but the plant data does not say. It records a plant name and an operator — City of Logan - (UT) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Hydro III LLC" usually means this site. This page does not assert a corporate structure it cannot see.
- Is Hydro III still running?
- Its status is "Operating" as of 2026-07. Statuses change monthly, and this page is updated monthly.