Chief Joseph
Chief Joseph is a 2 GW hydroelectric power plant in Douglas County, Washington, operated by USACE Northwestern Division. EIA-860M lists 27 generating units here. Its units entered service between 1955 and 1979.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 2,456.2 MW
- 2,456.2 MW net summer
- Generating units
- 27
- In service
- 1955–1979
- EIA plant ID
- 3921
Where it is
Loading map…
- County
- Douglas County, Washington
- Coordinates
- 47.9951, -119.6404
- Balancing authority
- BPAT
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- USACE Northwestern Division
- Primary energy source
- Hydro
- Technologies
- Conventional Hydroelectric
- Status
- Operating (19) · Out of service but expected to return to service in next calendar year (6) · Out of service and NOT expected to return to service in next calendar year (2)
Chief Joseph: FAQ
- Where is Chief Joseph?
- In Douglas County, Washington (WA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Chief Joseph?
- 2 GW of nameplate capacity across 27 units, as of the EIA-860M release for 2026-07.
- Who owns Chief Joseph?
- EIA-860M names USACE Northwestern Division as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Chief Joseph LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — USACE Northwestern Division here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Chief Joseph LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Chief Joseph still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.