El Centro Hybrid

El Centro Hybrid is a 388 MW natural gas power plant in Imperial County, California, operated by Imperial Irrigation District. EIA-860M lists 7 generating units here. Its units entered service between 1952 and 2016.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
388.3 MW
323.1 MW net summer
Generating units
7
In service
1952–2016
EIA plant ID
389

Where it is

Loading map…
County
Imperial County, California
Coordinates
32.8022, -115.54
Balancing authority
IID
Sector
Electric Utility

Units, technology and status

Operator of record
Imperial Irrigation District
Primary energy source
Natural gas
Technologies
Batteries, Natural Gas Fired Combined Cycle, Natural Gas Steam Turbine
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Natural gas 358 MW, Battery 30 MW. It is filed here under Natural gas, the source with the most capacity.

Every plant Imperial Irrigation District reports to EIA →

El Centro Hybrid: FAQ

Where is El Centro Hybrid?
In Imperial County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is El Centro Hybrid?
388 MW of nameplate capacity across 7 units, as of the EIA-860M release for 2026-07.
Who owns El Centro Hybrid?
EIA-860M names Imperial Irrigation District as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as El Centro Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Imperial Irrigation District here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "El Centro Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is El Centro Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.