Coalinga Cogeneration Facility

Coalinga Cogeneration Facility is a 7 MW natural gas power plant in Fresno County, California, operated by Aera Energy LLC-Coalinga. EIA-860M lists 2 generating units here, inside CAISO. Its units entered service in 1988.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
6.8 MW
6.4 MW net summer
Generating units
2
In service
1988
EIA plant ID
50750

Where it is

Loading map…
County
Fresno County, California
Coordinates
36.1703, -120.3641
Balancing authority
CISO
Sector
Industrial CHP

Units, technology and status

Operator of record
Aera Energy LLC-Coalinga
Primary energy source
Natural gas
Technologies
Natural Gas Fired Combustion Turbine
Status
Operating

Every plant Aera Energy LLC-Coalinga reports to EIA →

Coalinga Cogeneration Facility: FAQ

Where is Coalinga Cogeneration Facility?
In Fresno County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Coalinga Cogeneration Facility?
7 MW of nameplate capacity across 2 units, as of the EIA-860M release for 2026-07.
Who owns Coalinga Cogeneration Facility?
EIA-860M names Aera Energy LLC-Coalinga as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Coalinga Cogeneration Facility LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Aera Energy LLC-Coalinga here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Coalinga Cogeneration Facility LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Coalinga Cogeneration Facility still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.