Biola University Hybrid

Biola University Hybrid is a 4 MW natural gas power plant in Los Angeles County, California, operated by Biola University. EIA-860M lists 4 generating units here, inside CAISO. Its units entered service between 2002 and 2023.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
4.3 MW
4.3 MW net summer
Generating units
4
In service
2002–2023
EIA plant ID
54296

Where it is

Loading map…
County
Los Angeles County, California
Coordinates
33.907, -118.0131
Balancing authority
CISO
Sector
Commercial CHP

Units, technology and status

Operator of record
Biola University
Primary energy source
Natural gas
Technologies
Batteries, Natural Gas Internal Combustion Engine
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Natural gas 4 MW, Battery 0 MW. It is filed here under Natural gas, the source with the most capacity.

Every plant Biola University reports to EIA →

Biola University Hybrid: FAQ

Where is Biola University Hybrid?
In Los Angeles County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Biola University Hybrid?
4 MW of nameplate capacity across 4 units, as of the EIA-860M release for 2026-07.
Who owns Biola University Hybrid?
EIA-860M names Biola University as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Biola University Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Biola University here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Biola University Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Biola University Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.