AES Huntington Beach Energy Project

AES Huntington Beach Energy Project is a 699 MW natural gas power plant in Orange County, California, operated by AES Huntington Beach Energy, LLC. EIA-860M lists 3 generating units here, inside CAISO. Its units entered service in 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
699.2 MW
630 MW net summer
Generating units
3
In service
2020
EIA plant ID
62116

Where it is

Loading map…
County
Orange County, California
Coordinates
33.6456, -117.9794
Balancing authority
CISO
Sector
IPP Non-CHP

Units, technology and status

Operator of record
AES Huntington Beach Energy, LLC
Primary energy source
Natural gas
Technologies
Natural Gas Fired Combined Cycle
Status
Operating

Every plant AES Huntington Beach Energy, LLC reports to EIA →

AES Huntington Beach Energy Project: FAQ

Where is AES Huntington Beach Energy Project?
In Orange County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is AES Huntington Beach Energy Project?
699 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
Who owns AES Huntington Beach Energy Project?
EIA-860M names AES Huntington Beach Energy, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as AES Huntington Beach Energy Project LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — AES Huntington Beach Energy, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "AES Huntington Beach Energy Project LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is AES Huntington Beach Energy Project still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.