Procter & Gamble Power Plant

Procter & Gamble Power Plant is a 193 MW natural gas power plant in Sacramento County, California, operated by Sacramento Municipal Util Dist. EIA-860M lists 4 generating units here. Its units entered service between 1997 and 2001.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
193.4 MW
176.6 MW net summer
Generating units
4
In service
1997–2001
EIA plant ID
7551

Where it is

Loading map…
County
Sacramento County, California
Coordinates
38.5309, -121.4001
Balancing authority
BANC
Sector
Electric Utility

Units, technology and status

Operator of record
Sacramento Municipal Util Dist
Primary energy source
Natural gas
Technologies
Natural Gas Fired Combined Cycle, Natural Gas Fired Combustion Turbine
Status
Operating

Every plant Sacramento Municipal Util Dist reports to EIA →

Procter & Gamble Power Plant: FAQ

Where is Procter & Gamble Power Plant?
In Sacramento County, California (CA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Procter & Gamble Power Plant?
193 MW of nameplate capacity across 4 units, as of the EIA-860M release for 2026-07.
Who owns Procter & Gamble Power Plant?
EIA-860M names Sacramento Municipal Util Dist as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Procter & Gamble Power Plant LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Sacramento Municipal Util Dist here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Procter & Gamble Power Plant LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Procter & Gamble Power Plant still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.