Intercession City

Intercession City is a 1 GW natural gas power plant in Osceola County, Florida, operated by Duke Energy Florida, LLC. EIA-860M lists 14 generating units here. Its units entered service between 1974 and 2000.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
1,197.3 MW
940 MW net summer
Generating units
14
In service
1974–2000
EIA plant ID
8049

Where it is

Loading map…
County
Osceola County, Florida
Coordinates
28.2628, -81.5486
Balancing authority
FPC
Sector
Electric Utility

Units, technology and status

Operator of record
Duke Energy Florida, LLC
Primary energy source
Natural gas
Technologies
Natural Gas Fired Combustion Turbine, Petroleum Liquids
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Natural gas 709 MW, Petroleum 489 MW. It is filed here under Natural gas, the source with the most capacity.

Every plant Duke Energy Florida, LLC reports to EIA →

Intercession City: FAQ

Where is Intercession City?
In Osceola County, Florida (FL). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Intercession City?
1 GW of nameplate capacity across 14 units, as of the EIA-860M release for 2026-07.
Who owns Intercession City?
EIA-860M names Duke Energy Florida, LLC as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Intercession City LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — Duke Energy Florida, LLC here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Intercession City LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Intercession City still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.