Cleary Flood Hybrid

Cleary Flood Hybrid is a 121 MW natural gas power plant in Bristol County, Massachusetts, operated by City of Taunton - (MA). EIA-860M lists 3 generating units here, inside ISO New England. Its units entered service between 1975 and 2020.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
121 MW
105.9 MW net summer
Generating units
3
In service
1975–2020
EIA plant ID
1682

Where it is

Loading map…
County
Bristol County, Massachusetts
Coordinates
41.8653, -71.1061
Balancing authority
ISNE
Sector
Electric Utility

Units, technology and status

Operator of record
City of Taunton - (MA)
Primary energy source
Natural gas
Technologies
Batteries, Natural Gas Fired Combined Cycle
Status
Operating

This site runs on more than one energy source. EIA-860M capacity splits: Natural gas 118 MW, Battery 3 MW. It is filed here under Natural gas, the source with the most capacity.

Every plant City of Taunton - (MA) reports to EIA →

Cleary Flood Hybrid: FAQ

Where is Cleary Flood Hybrid?
In Bristol County, Massachusetts (MA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Cleary Flood Hybrid?
121 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
Who owns Cleary Flood Hybrid?
EIA-860M names City of Taunton - (MA) as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Cleary Flood Hybrid LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — City of Taunton - (MA) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Cleary Flood Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Cleary Flood Hybrid still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.