Cleary Flood Hybrid
Cleary Flood Hybrid is a 121 MW natural gas power plant in Bristol County, Massachusetts, operated by City of Taunton - (MA). EIA-860M lists 3 generating units here, inside ISO New England. Its units entered service between 1975 and 2020.
As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m
- Nameplate capacity
- 121 MW
- 105.9 MW net summer
- Generating units
- 3
- In service
- 1975–2020
- EIA plant ID
- 1682
Where it is
Loading map…
- County
- Bristol County, Massachusetts
- Coordinates
- 41.8653, -71.1061
- Balancing authority
- ISNE
- Sector
- Electric Utility
Units, technology and status
- Operator of record
- City of Taunton - (MA)
- Primary energy source
- Natural gas
- Technologies
- Batteries, Natural Gas Fired Combined Cycle
- Status
- Operating
This site runs on more than one energy source. EIA-860M capacity splits: Natural gas 118 MW, Battery 3 MW. It is filed here under Natural gas, the source with the most capacity.
Cleary Flood Hybrid: FAQ
- Where is Cleary Flood Hybrid?
- In Bristol County, Massachusetts (MA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
- How big is Cleary Flood Hybrid?
- 121 MW of nameplate capacity across 3 units, as of the EIA-860M release for 2026-07.
- Who owns Cleary Flood Hybrid?
- EIA-860M names City of Taunton - (MA) as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
- Is this the same as Cleary Flood Hybrid LLC?
- Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — City of Taunton - (MA) here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Cleary Flood Hybrid LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
- Is Cleary Flood Hybrid still running?
- EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.