Smith College Central Heating Plant

Smith College Central Heating Plant is a 5 MW natural gas power plant in Hampshire County, Massachusetts, operated by The Trustees of Smith College. EIA-860M lists 1 generating unit here, inside ISO New England. Its unit entered service in 2008.

As of 2026-07 (inventory dated 2026-07-31) · EIA-860M Preliminary Monthly Electric Generator Inventory · eia.gov/…/july_generator2026.xlsx · eia.gov/…/eia860m

Nameplate capacity
5.3 MW
2.7 MW net summer
Generating units
1
In service
2008
EIA plant ID
58166

Where it is

Loading map…
County
Hampshire County, Massachusetts
Coordinates
42.3125, -72.6394
Balancing authority
ISNE
Sector
Commercial CHP

Units, technology and status

Operator of record
The Trustees of Smith College
Primary energy source
Natural gas
Technologies
Natural Gas Fired Combustion Turbine
Status
Operating

Every plant The Trustees of Smith College reports to EIA →

Smith College Central Heating Plant: FAQ

Where is Smith College Central Heating Plant?
In Hampshire County, Massachusetts (MA). The map on this page is placed at the coordinates EIA files for the plant, which locate the site rather than any individual unit.
How big is Smith College Central Heating Plant?
5 MW of nameplate capacity across 1 unit, as of the EIA-860M release for 2026-07.
Who owns Smith College Central Heating Plant?
EIA-860M names The Trustees of Smith College as the reporting entity. That is the operator of record on the survey, which is not always the ultimate owner.
Is this the same as Smith College Central Heating Plant LLC?
Probably, but EIA-860M does not say. The survey records a plant name and a reporting entity — The Trustees of Smith College here — not the project company that holds the asset. Project companies are commonly registered as an LLC carrying the plant's name, so a search for "Smith College Central Heating Plant LLC" usually means this site. This page shows only what EIA files, and does not assert a corporate structure it cannot see.
Is Smith College Central Heating Plant still running?
EIA-860M files it as "Operating" for 2026-07. Statuses change monthly, and this page follows the monthly release.